1. Living Room & Dining Area
- TV unit / entertainment wall panel
- Sofa set and center table (basic to premium options)
- Dining table with chairs
- False ceiling with recessed and accent lighting
- Wall finishes (paint, wallpaper, cladding, or paneling)
- Curtains, rugs, and accessories (optional in some packages)
2. Modular Kitchen
- Base and wall cabinets (laminate / acrylic / veneer)
- Tall units, pull-outs, corner units
- Countertop installation (granite, quartz, marble)
- Backsplash (tiles / glass)
- Space for built-in appliances (chimney, hob, oven)
- Utility storage units (if part of kitchen)
3. Master Bedroom
- Wardrobe (sliding or hinged, laminate or premium finish)
- Bed with storage or hydraulic lift option
- Side tables and dresser unit
- False ceiling with mood lighting
- Feature wall (paint, wallpaper, or panelling)
- Curtains, bedding, and accessories (optional)
4. Bedroom 2 (Kids / Teen Room)
- Wardrobe with smart storage
- Bed (single / queen with storage)
- Study table and chair with open shelves
- Bookshelves or display racks
- False ceiling with playful lighting
- DΓ©cor elements (wall decals, pinboards, wallpaper)
5. Bedroom 3 (Guest / Parents Room)
- Wardrobe with basic finish
- Standard bed or sofa-cum-bed
- Side tables and minimal furniture
- Paint / wallpaper as per theme
- Basic false ceiling and lighting (optional in some packages)
6. Bathrooms (2β3 Units)
- Vanity units with storage
- Mirrors with LED backlighting
- Modular storage cabinets
- Shower partitions / enclosures (optional)
- Designer tiles and wall finishes
7. Foyer & Passage Areas
- Shoe rack / storage cabinet
- Decorative wall panel / mirror
- False ceiling with ambient lighting
- Paint / wall finishes
8. Balcony & Utility Area
- Seating (swing, foldable chairs, compact sofas)
- Vertical planters or railing planters
- Storage cabinets for washing machine / cleaning supplies
9. Common Work Across All Rooms
- False ceiling with concealed wiring
- Electrical layout planning and fittings
- Wall painting / wallpaper installation
- Flooring (if included in package)
- Soft furnishings (optional in basic packages, standard in premium)
Package Types by Scope
- Basic Package (βΉ7β12 lakh): Modular kitchen + wardrobes + painting + lighting (no premium furniture).
- Mid-Range Package (βΉ12β18 lakh): Modular units + false ceilings + furniture + dΓ©cor.
- Premium Package (βΉ20β30 lakh+): Fully customized furniture, luxury finishes, soft furnishings, appliances, and dΓ©cor styling.
FAQs: Scope of Work in 3BHK Interior Design Packages
Q1. What does a 3BHK interior design package typically include?
It usually covers modular kitchen, wardrobes, TV unit, false ceiling, lighting, wall finishes, and basic furniture. Premium packages may also include soft furnishings, appliances, and dΓ©cor styling.
Q2. Is furniture included in all 3BHK interior design packages?
Not always. Basic packages cover only fixed furniture like wardrobes and kitchen units. Premium packages include loose furniture like sofas, beds, and dining tables.
Q3. Are false ceilings part of the scope of work?
Yes. False ceilings with concealed lighting are standard in mid-range and premium packages, but optional in budget packages.
Q4. What is included in the modular kitchen scope?
Cabinetry, countertop, backsplash, storage accessories, and space for appliances. Actual appliances (chimney, hob, oven) are usually charged separately.
Q5. Do interior design packages include bathroom work?
Yes. Vanity units, mirrors, storage, and wall finishes are included. High-end fittings, sanitaryware, or complete bathroom renovation may cost extra.
Q6. Are painting and wall finishes part of the package?
Yes. All packages include wall painting. Wallpapers, wall cladding, or panelling are standard in mid-to-premium packages.
Q7. Does the package cover balcony and utility areas?
Yes, but usually as add-ons. Basic balconies include seating and planters. Premium versions add customized storage and dΓ©cor.
Q8. Are electrical fittings and lighting included?
Yes. Electrical wiring, points, and light fittings (LEDs, false ceiling lights) are included. Premium packages may add chandeliers or designer fixtures.
Q9. Is flooring replacement included in the scope of a 3BHK package?
No, most packages exclude flooring unless specified. Changing tiles or wooden flooring is usually billed separately.
Q10. Are soft furnishings like curtains and rugs included?
Not in basic packages. They are part of premium packages or can be added separately.
Q11. Can I choose to style only certain rooms in my 3BHK?
Yes. Designers allow room-wise scope of work like βkitchen + wardrobes onlyβ or βliving + master bedroom package.β
Q12. Does the scope cover structural or civil changes?
Minor civil work like false ceilings and electricals is included. Major work like wall demolition, plumbing relocation, or flooring changes is usually extra.
Q13. Do 3BHK packages include appliances?
No. Appliances (AC, fridge, washing machine, oven) are excluded. Only the space for installation is designed.
Q14. Can I customize the scope of work to fit my budget?
Yes. Most designers offer flexible packagesβstart with essentials (kitchen, wardrobes) and add dΓ©cor later.
Q15. How long does it take to complete the full scope of work for a 3BHK?
Typically 3β6 months, depending on complexity, finish type, and material availability.