That’s a crucial question 👍 — because design fee structures vary widely among interior designers in Delhi NCR, and the way it’s charged can affect your overall budget.
Here’s the breakdown of the 3 most common fee models you’ll come across:
✅ 1. Flat Fee (Lump Sum)
- How it works: One fixed price for the entire design scope.
- Range in Delhi NCR: ₹50,000 – ₹2,50,000 (for 2BHK–3BHK flats), higher for villas.
- Best for: Smaller projects where area-based charging isn’t practical.
- Good if you want clarity upfront with no surprises.
✅ 2. Per Sq. Ft. of Area
- How it works: Fee calculated on built-up or carpet area.
- Range in Delhi NCR: ₹50 – ₹250 per sq.ft. (design-only).
- Example: 1,200 sq.ft. × ₹100/sq.ft. = ₹1,20,000 design fee.
- Best for: Apartments, where project size and scope are easy to measure.
- Caution: Clarify whether it’s based on carpet or built-up area.
✅ 3. Percentage of Project Cost
- How it works: Fee is a % of total project value (materials + execution).
- Range in Delhi NCR: 7% – 15%.
- Example: Project cost ₹20 lakhs → design fee = ₹1.4L–₹3L.
- Best for: High-budget/luxury projects (villas, bungalows, farmhouses).
- Advantage: Designer is incentivized to handle execution well.
- Caution: Ensure % is fixed, otherwise costs can creep up.
⚡ Other Models You May See
- Design + Execution Package: Some turnkey firms don’t charge separate design fees — they build margin into execution. (E.g., Livspace, MADS Creations).
- Hourly Fee: Rare in India, but some premium consultants charge per consultation hour for advice only.
💡 What You Should Ask
- Is your fee flat, per sq.ft., or percentage of project cost?
- What exactly does the design fee include (site visits, 3D renders, BOQ, revisions)?
- If I go ahead with execution through you, is design fee adjusted/waived?
- How many revisions & site visits are covered under the fee?
- Are there extra charges for additional visits or re-designs?
⚠️ Red Flags
- Designer avoids giving a clear fee structure.
- Fee looks low but excludes 3D renders, site visits, or supervision (added later as “extras”).
- They charge per sq.ft. but don’t clarify if it’s built-up, carpet, or super area.
👉 Would you like me to prepare a side-by-side comparison chart (Flat Fee vs Sq.Ft vs %) with pros, cons, and who it’s best for, so you can quickly decide which model works best for your project?