Thatโs a must-ask question ๐ โ because in almost every project, some changes happen during execution (new finishes, extra storage, shifting layouts). If this isnโt handled transparently, it leads to hidden charges, disputes, and delays.
Hereโs how a professional designer in Delhi NCR should handle it:
โ Standard Process for Handling Design Changes & Cost
1. Change Request Documented
- Any change (e.g., โconvert 2-door wardrobe to sliding, change laminate to veneerโ) must be put in writing (email/WhatsApp approval).
- Designer prepares a Change Order โ listing scope, material, brand, and impact.
2. Cost Impact Shared Before Execution
- Designer gives you a revised BOQ/line item with cost difference.
- Example:
- Laminate wardrobe (โน1,200/sq.ft.) โ Veneer wardrobe (โน1,800/sq.ft.)
- Difference: +โน600/sq.ft. ร 30 sq.ft. = โน18,000 extra.
- You approve or reject before work starts.
3. Timeline Impact Assessed
- Along with cost, the designer must tell you if the change affects project duration.
- Example: Veneer requires polishing โ adds 7โ10 days.
4. Variation Register Maintained
- All approved changes are added to a Variation Register (Excel or shared document).
- Tracks cost increase/decrease, timeline changes.
- Prevents last-minute surprises at billing stage.
5. Final Cost Reconciliation
- At handover, you receive a Budget vs Final Cost Report with all changes noted.
- Any extra cost should match previously approved changes only.
๐ก What You Should Ask Your Designer
- How do you document design change requests?
- Do you give revised cost estimates in writing before implementing?
- How do you track cumulative cost changes?
- Do you also share timeline impact for each change?
- Can you provide a variation register format you use with clients?
โ ๏ธ Red Flags
- Designer says โDonโt worry, weโll adjust laterโ ๐ฉ โ no transparency.
- Changes are executed without written client approval.
- Final bill includes โextra chargesโ you were never told about.
โ Pro Tip
- Insist on a Change Order system โ no change without written approval.
- Keep a 10โ15% contingency buffer in budget for upgrades/changes.
- Ask for a variation tracker in Excel shared weekly.
๐ Do you want me to create a Change Order / Variation Register Template (Excel) with columns for Requested By, Change Description, Cost Impact, Timeline Impact, Approved By so you can use it to keep your designer accountable?