That’s one of the must-ask questions 📝 because interior design projects in Delhi NCR often get delayed if timelines aren’t planned clearly. A professional designer should always give you a milestone-based schedule, not just “2–3 months.”
Here’s what you should expect:
✅ Typical Project Timelines in Delhi NCR
For an average 2BHK–3BHK apartment (900–1500 sq. ft.):
Phase | What Happens | Avg. Duration |
---|---|---|
1. Design & Planning | Site survey, measurements, 2D layouts, mood boards, 3D renders, BOQ approval | 2–4 weeks |
2. Material Selection & Approvals | Choose laminates, tiles, paints, fittings, lights, appliances | 1–2 weeks |
3. Civil Work (if any) | Demolition, new walls, electrical rewiring, plumbing | 1–3 weeks |
4. False Ceiling & Electrical | POP/Gypsum false ceilings, concealed wiring, lighting setup | 1–2 weeks |
5. Carpentry / Modular Work | Wardrobes, kitchen cabinets, storage, partitions | 3–6 weeks (modular in factory, then site install) |
6. Finishes | Painting, polishing, laminates/veneer, wallpapers, flooring if needed | 2–3 weeks |
7. Furniture & Décor | Beds, sofas, dining, curtains, loose furniture delivery | 2–4 weeks |
8. Final Installation & Handover | Fittings, cleaning, snagging, corrections | 1 week |
⏳ Total Project Duration:
- Small 2BHK (basic interiors) → 8–10 weeks
- 3BHK (full interiors, mid-range) → 10–14 weeks
- Luxury / villa projects → 4–6 months
⚡ Factors That Affect Timeline
- Material availability (imported tiles, custom furniture can delay).
- Festivals/holidays (Diwali, Holi, wedding season = labour shortages).
- Last-minute design changes (adding false ceiling later, changing finishes).
- Approval delays (if you take long to finalize 3D design or materials).
💡 How to Get a Reliable Timeline from Your Designer
Ask them to provide a milestone chart like this:
- Week 1–2: Finalize designs & approvals
- Week 3–6: Carpentry work
- Week 7: False ceiling + paint base
- Week 8–9: Install wardrobes + kitchen
- Week 10: Final touch-ups + handover
Also ask:
- “What buffer have you kept for delays?” (a 10–15% time buffer is normal)
- “Who tracks milestones and updates me?” (weekly progress reports help)
- “What’s the penalty if delays are from your side?”
👉 Do you want me to prepare a ready-to-use project timeline template (Gantt chart style) for a 2BHK/3BHK in Delhi NCR that you can ask your designer to fill in? This way, you’ll have milestones clearly tracked.